09-03-2009, 05:42 PM
<blockquote id="quote"><font size="1" face="Verdana, Arial, Helvetica, san" id="quote">quote<hr height="1" noshade id="quote"><i>Originally posted by tango_acc</i>
<br />hi,
as i know direct cost = variable cost.
1) may i know indirect cost = fixed cost?
2) if indirect cost not 100% is fixed cost, may i know what other thing can be considered as indirect cost?
thanks
rgds
<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
direct cost may be variable and fixed so the case with indirect cost
<br />hi,
as i know direct cost = variable cost.
1) may i know indirect cost = fixed cost?
2) if indirect cost not 100% is fixed cost, may i know what other thing can be considered as indirect cost?
thanks
rgds
<hr height="1" noshade id="quote"></font id="quote"></blockquote id="quote">
direct cost may be variable and fixed so the case with indirect cost